sewer line testing procedure

Visual inspection of sewer pipes. Immediately before performing line acceptance test, remove cap, clear pipe . In our video, the primary sources of inflow that we target are storm inlets that are directly or indirectly connected to the sanitary sewer system. ADVERTISEMENTS: The various steps involved in the laying and testing of sewers are: 1. not to cause a failure of this test. (2) The Contractor may desire to make an air test prior to backfilling . C. Procedure Note: Conduct deflection test prior to low-pressure air test. PART 1 GENERAL 1.01 DESCRIPTION A. . Hydrostatic Testing of Pressure Pipelines: 15042 C. Testing 1. This test is used for line acceptance or leak location. as not to cause a failure of this test. PART 2 PRODUCTS The test starts by pulling the mandrel from one end of the pipe to the other. Afterwards the air is expelled out, stop cock is closed and the reading is noted after 30 minutes. On all sanitary sewer lines (plastic composite and ductile iron), including private sewer lines, the Contractor shall conduct a line acceptance test using low-pressure air testing.

An air test is performed by plugging each end of the lateral and applying 3.5 psi to the section under test. STORM SEWER SYSTEM TESTING . A positive test for in-filtration or ex-filtration. The infiltration test shall be used when the groundwater level is at least 2 feet above the crown of the pipe measured at the upstream manhole. C. ASTM F2454 Standard Practice for Sealing Lateral Connections and lines from the Mainline Sewer Systems by Lateral Packer Method, Using Chemical Grouting (latest PART 2 PRODUCTS Procedure for Air Testing of Sewer Pipe & Appurtenances (1) Summary of Method: Plug the section of the sewer line to be tested. required for testing sewer pipe joints by applying a positive air pressure to the joints, . Backfilling of Trenches. Laying and Jointing of Pipe Sewers 5. Excavation of Trenches, Timbering and Dewatering 4. Lines must be cleaned by flushing or by other means before the low-pressure air test is to begin. Get your South FL Home Tested Today A. The END OF SECTION 33 01 10.13 In other words, we're just checking to ensure the pipe is still round and not displaced under its current load. This section concerns the testing of storm sewer trunk lines, laterals, manholes, and appurtenances. sewer line installation. Alignment and Gradient of Sewers 3. Mandrel testing for flexible sewer pipes. Mandrel pull test after backfill is placed and stable at grade for 30-days. B. It is common practice to lay sewer line between two manholes at a time. Standard Operating Procedure Dye Testing REV 0 Purpose: Dye testing of sanitary sewer drains is required during all new building construction, building renovations, and any time a building plumbing fixture is connected to a drain line. Note: Conduct deflection test prior to low-pressure air test. Leakage is determined by measuring the flow through the opening in the downstream plug for at least . Apply an initial test vacuum pressure (negative pressure) of approximately 27 kPa. 6.2 The manholes, the ends of the branches, laterals, wyes and stubs to be included in the test shall be plugged. Preparation of the Sewer Line 6.1 The sewer shall should be free of debris prior to testing. testing. 4. Lines must be cleaned by flushing or by other means before the low-pressure air test is to begin. Measurement and Payment Procedures 1. 1. 3.4 TESTING GRAVITY SEWER PIPING A. Low-pressure Air Test: 1. As per EN1610, the pipe plugs must be inflated to the maximum permissible inflation pressure. Procedures and test criteria for water infiltration and exfiltration tests of concrete pipe sewer lines are prescribed in ASTM C969. This insures and verifies that there is an adequate . C. Procedure . Introduce low-pressure air into the plugged line. Immediately before performing line acceptance test, remove cap, clear pipe . 6 Steps to Performing a Smoke Test 1. 2. 1. Isolate the sewer line to be tested with the plugs referenced above and ensure that all other outlets from which air could . 4. Identify test areas: Identify areas of the sanitary sewer system that experience inflow during wet weather. 11.2.3.1 Air Test Procedure (Dry Conditions) The following procedure shall be used during the low -pressure air testing of sewer mains 3. Perform test in accordance with applicable portions of ASTM 828 and ASTM 924. For ductile . 7 If a manhole fails the vacuum test, the manhole shall be uncovered and the leak repaired by patching the exterior of the manhole. Sewer Testing for Straightness of Alignment and Obstruction. Make the installation through manhole wall on top of the sewer line where line enters manhole. On all sanitary sewer lines (plastic composite and ductile iron), including private sewer lines, the Contractor shall conduct a line acceptance test using low-pressure air testing. A "Dye Test Payment" form must be completed and a $350 fee paid prior to scheduling a dye test. This test can often be conducted the . This section concerns the testing of storm sewer trunk lines, laterals, manholes, and appurtenances. For every foot of Lines must be cleaned by flushing or by other means before the low-pressure air test is to begin. The This test ball prevents any water from exiting the under slab piping once filled. The smoke testing technique is uncomplicated and can be performed by regular maintenance crew members (2 or 3) who quickly master the fundamentals. PART 1 GENERAL 1.01 DESCRIPTION A. 3.4 TESTING GRAVITY SEWER PIPING A. Low-pressure Air Test: 1. Use the quantity and rate of air loss to determine the acceptability of the section being tested. 11.2.3.1 Air Test Procedure (Dry Conditions) The following procedure shall be used during the low -pressure air testing of sewer mains 4. Isolate the sewer line to be tested with the plugs referenced above and ensure that all other outlets from which air could . Acceptance testing criteria and procedures for sanitary sewers below are mandatory: 1. Also cost effective solution. B. The Isolation Test is done by utilizing an inflatable test ball/plug, maneuvered throughout the sewer lines, with the help of a camera, to isolate and identify the locations of the leak(s). Start flushing the toilet several times, or run the water into the sink for several minutes. The straightness of the sewer . STORM SEWER SYSTEM TESTING .

All plugs shall be secured to prevent leakage blowout due to testing pressure. Conclusion Our entire team is at your disposal to meet your specific needs. When sewer main diameters are greater than 24-inches. 2. Close the valve on the vacuum line and shut off the vacuum pump. The test time, tables and procedures are based on the ASTM C828 Test Introduce air pressure slowly to approximately 4 psig. Include all costs for testing, required by this Section in the bid prices for manholes, pipe, and appurtenant structures. This leakage test is done by the following steps: This is done by performing a low-pressure air test. 2. If the sewer lines are unable to fill or they lose water once filled, then a leak exists. In the low-pressure air test, the sewer line to be tested is plugged at both ends, air is introduced at low pressure into the plugged line and the amount of air loss during a specified time period is mea- sured. Dye testing confirms that all sanitary sewer drains are properly plumbed and This section describes the requirements and procedures for leakage and infiltration testing of gravity sewer systems, in accordance with ANSI/ASTM C828, Low Pressure Air Test of Vitrified Clay Pipelines. If the loss exceeds 1/2 psi in 5 minutes the test may be attempted one additional time. laying of sewage pipe consist of the following steps. DYE TEST PROCEDURES Borough Code, Chapter 285, establishes the requirement for certification of sanitary sewer status prior to the sale of real estate within the Borough of Fox Chapel and as a condition for the issuance of a municipal no lien letter. A. How to insert the dye for a sewer dye test. In sewer inspections, sewer line inspectors typically collect visual data to assess the condition of a pipe or some other part of wastewater infrastructure. A specific drop in air pressure within a pipe system over a specified length of time determines acceptance or failure of the line in question. 2. B. Infiltration Test: Minimum test time is 2 hours. The manhole shall then be backfilled and re-tested 8 The vacuum testing of the manholes shall be done prior to air testing the sewer lines that enter of exit the manhole. Determine groundwater elevation above spring line of pipe. Introduce air pressure slowly to approximately 4 psig. Verifies the integrity of new sewer lines. Identify test areas: Identify areas of the sanitary sewer system that experience inflow during wet weather. For every foot of Simple, fast and efficient quality control tests. 1. The sewers are tested by plugging the upper end with a provision for an air outlet pipe with stop cock. How is a sewer pressure test typically performed? 1. The Low Pressure Air Loss Test outlined above is the standard test procedure. Procedure 7.1 Inltration Testing: DYE TEST PROCEDURES Borough Code, Chapter 285, establishes the requirement for certification of sanitary sewer status prior to the sale of real estate within the Borough of Fox Chapel and as a condition for the issuance of a municipal no lien letter. Locate the positions of the manhole on the ground along the longitudinal section of the sewer line. A "Dye Test Payment" form must be completed and a $350 fee paid prior to scheduling a dye test. Setting out Sewer Centre Line: This is the first step in the laying of sewers.

sure Sewer Lines Using Low-Pressure Air D. Uni-Bell PVC Pipe Association: UNI-B-6-98 - Recommended Practice for Low-Pressure Air Testing of Installed . 3. Include all costs for testing, required by this Section in the bid prices for manholes, pipe, and appurtenant structures. Measurement and Payment Procedures 1. The pipe line is then inspected. 2. Isolate the sewer line to be tested with the plugs referenced above and ensure that all other outlets from which air could escape are . Test each section of gravity sewer piping between manholes. 3. Steps for the water leak test. Alignment and Gradient of Sewers 3. 1. 6. Plug all sewer inlets and outlets and cap and seal all maintenance shafts, inspection opening shafts and risers in the test length of sewer. The test starts by pulling the mandrel from one end of the pipe to the other. For ductile . When sewer main diameters are 24-inches and smaller; unless water table is 2-feet or more above the top of pipe at upstream end of main or the calculated air test pressure is greater than 9 psi. Mandrel testing for flexible sewer pipes. 2. Testing of Pipe Sewers 6. Pour the dye inside the toilet bowl or into an under sink drain trap. The test section is from the building cleanout to the property line cleanout. Setting out Sewer Centre Line 2. The leakage pipe if any will also be replaced. In other words, we're just checking to ensure the pipe is still round and not displaced under its current load. 2. Acceptance testing criteria and procedures for sanitary sewers below are mandatory: 1. In our video, the primary sources of inflow that we target are storm inlets that are directly or indirectly connected to the sanitary sewer system. 1.1 This practice provides procedures for testing non-pressure plastic pipe sewer lines, using low-pressure air to prove the integrity of the installed material and the construction procedures. 2. Testing of Pipe Sewers 6. Visual inspection of sewer pipes. 2. PVC Sewer Pipe: 02715 2. There are two main reasons to conduct a visual inspections of a sewer: 1) To identify and fix a problem that has suddenly created an emergency 2. C. Procedure . 3.2 PREPARATION A. Perform test in accordance with applicable portions of ASTM 828 and ASTM 924. When the petcock is closed, the water is pressurized to 3.5 psig above the pressure exerted by the groundwater. Laying and Jointing of Pipe Sewers 5. Two procedures are included to find the rate of air leakagethe constant-pressure method and the time-pressure drop method. If these locations pose a challenge, simply flush the dye down inside your toilet (see below). The center line pegs of the sewer are driven at a distance of every 7.5 m or 15m. Test procedures and recording methods have been submitted and approved. Backfilling of Trenches. This type of test is used to determine that the ovality of the sewer pipe meets its specification.

The water is filled through a funnel connected at the lower end provided with a plug. Perform the water test procedure to determine the quality of the sewer line against infiltration and exfiltration only when specifically approved by Little Rock Wastewater. Can also verify workmanship of newly installed sewer lines. The cost is only a few cents per foot for labor, blower, and smoke product. This type of test is used to determine that the ovality of the sewer pipe meets its specification. Where approved, follow the procedure below. then fill the test section with water up to 5 metres and monitor the water level; this means 0.5 bar because a water level of 5 metres is equal to 0.5 bar (50 kPa). The water is then filled in the manhole at the upper end and is allowed to flow through the sewer line. Testing can be performed on various types of sewer pipe including newly installed or however pre-existing lines. Section 01 70 00 - Execution and Closeout Requirements. Sewer smoke testing is the most cost effective method to find sources of surface water inflow & infiltration - the leading cause of wet weather SSO's. Fast and easy to do, smoke testing produces immediate results that can be acted on quickly - often at minimal expense to the municipality.

3. Determine groundwater elevation above spring line of pipe. Test procedure - Vacuum air test. 3.6 JOINT TESTING PROCEDURE FOR MAINLINE SEWER AND LATERALS . Note: Conduct deflection test prior to low-pressure air test. 1. as not to cause a failure of this test. 7. Excavation of Trenches, Timbering and Dewatering 4. Related Work Specified Elsewhere 1. 2nd step: Place the Pipe Plug and the Pipe Test Plug, which is connected with the air discharge adapter, in the pipeline that should be tested. A water test is then done by introducing water into a void volume until water flows evenly from the open petcock.